SuiteFlagship Automation

FIDIC Claims Intelligence Suite

AI-Assisted Claims Preparation and Contractual Intelligence for EPC Projects. Four integrated modules that ensure 100% notice compliance, contemporaneous event logging, persuasive claim narratives, and contractually precise correspondence.

Download Materials

The Problem: Claims Preparation Is Broken

Notice Deadlines Missed

Contractors lose entitlements because notice deadlines slip through manual tracking. A single missed 28-day notice can forfeit millions in claims.

Weeks of Manual Drafting

Claim narratives take weeks to prepare. Delay analysts spend months compiling event logs. Correspondence requires multiple revisions for contractual accuracy.

Weak Claim Narratives

Claims submitted without proper FIDIC structure lack persuasive power. Engineers reject incomplete claims, delaying recovery and increasing dispute risk.

Correspondence Errors

Incorrect clause references, wrong addressees, imprecise language. Every correspondence error weakens the contractual record and creates dispute vulnerabilities.

Claims Intelligence Workflow

From project event to claims support — an integrated workflow that ensures every entitlement is captured, documented, and pursued.

Step 1

Project Events

Delay events, variation instructions, site conditions, correspondence

Step 2

Notice Tracking

Automated FIDIC notice monitoring across 20+ clause types

Step 3

Event Logging

Contemporaneous delay event compilation with attribution

Step 4

Claim Narrative

AI-assisted claim drafting under FIDIC Sub-Clause 20.1

Step 5

Correspondence

Contractually precise letters and notices

Step 6

Claims Support

Complete claims package for Engineer review

Four Integrated Modules

Each module operates independently or as part of the integrated suite. Deploy what you need, when you need it.

FIDIC Notice Monitor

Building

100% Notice Compliance. Zero Missed Deadlines.

Automated monitoring of FIDIC contractual notice obligations. Tracks 20+ clause types, triggers alerts at 28/14/7/3/1 days, and escalates missed deadlines through a 4-level matrix.

100%
Notice Compliance
28/14/7/3/1 days
Alert Schedule
20+ FIDIC clauses
Clause Coverage

EOT Event Log Compiler

Concept

Contemporaneous Delay Records. Defensible EOT Claims.

Automated compilation of delay events from project schedules, correspondence, and site records. Creates contemporaneous event logs that support Extension of Time claims under FIDIC Sub-Clause 8.4.

Automated
Event Capture
Contractor/Engineer/Employer
Delay Attribution
FIDIC 8.4 Compliant
EOT Support

Claim Narrative Drafter

Concept

Structured Claims. Persuasive Narratives. Maximum Entitlement.

AI-assisted drafting of FIDIC claim narratives under Sub-Clause 20.1. Structures claims with entitlement basis, cause analysis, delay correlation, and quantum summary — ready for Engineer review.

FIDIC 20.1 Compliant
Claim Structure
Engineer-Ready
Narrative Quality
Maximum Recovery
Entitlement Focus

Letter Drafter EPC

Concept

Contractually Precise Correspondence. Every Time.

Automated generation of FIDIC-compliant letters, notices, and correspondence. Ensures correct clause references, proper addressees, and contractually precise language for every communication.

20+ FIDIC templates
Letter Types
100%
Clause Accuracy
Professional, Contractual
Tone

Supported FIDIC Processes

Comprehensive coverage of FIDIC contractual obligations — every notice, every deadline, every entitlement.

§20.128 days

Contractor's Claim

Event giving rise to claim

§8.428 days

Extension of Time

Cause of delay

§4.1228 days

Unforeseeable Conditions

Discovery of conditions

§8.528 days

Delay Caused by Employer

Employer-caused delay

§10.228 days

Taking Over

Partial takeover

§11.428 days

Defects Liability

Defect correction

§13.728 days

Adjustments for Changes

Change in law

§14.828 days

Delayed Payment

Payment delay

§15.214 days

Termination by Employer

Contractor default

§16.128 days

Contractor's Right to Suspend

Payment failure

§16.428 days

Termination by Contractor

Employer default

§17.128 days

Indemnities

Indemnity event

Business Outcomes

Measurable impact from AI-assisted claims preparation — not estimates, not projections, outcomes.

100%
Notice Compliance

Zero missed deadlines across all FIDIC notice obligations

85–90%
Reduction in Preparation Time

From weeks of manual drafting to hours of AI-assisted preparation

100%
Entitlement Preservation

Every contractual entitlement captured and documented

100%
Clause Reference Accuracy

Correct FIDIC clause references in every letter and notice

100%
Contemporaneous Records

Defensible evidence created at the time of events, not after

90%+
First-Pass Acceptance

Engineer-ready claims that require minimal revision

User Roles & Benefits

Claims Manager

Daily

Complete claims oversight — notice compliance, event logs, narrative quality, correspondence accuracy

Contract Administrator

Daily

Automated notice tracking, letter drafting, and deadline management across all FIDIC obligations

Delay Analyst

Weekly

Contemporaneous delay event logs with attribution, supporting EOT claim preparation

Project Manager

Weekly

Claims dashboard — compliance status, pending deadlines, claim progress, risk exposure

Legal Counsel

Monthly

Audit-ready claims documentation with contemporaneous records and contractual precision

Senior Management

Monthly

Executive claims intelligence — exposure summary, entitlement status, recovery potential

Representative Use Cases

Real-world scenarios where the Claims Intelligence Suite delivers measurable value.

FIDIC Yellow Book — EOT Claim (MAHSR T-3)

Context

Railway electrification package with concurrent delays from Employer-caused design changes and Force Majeure events

Solution

Notice Monitor tracked 12 delay events, EOT Log compiled contemporaneous records, Claim Narrative drafted 3 EOT claims, Letter Drafter issued 8 contractual notices

Outcome

100% notice compliance, 3 EOT claims submitted within 28-day deadlines, INR 45 Crore entitlement preserved

FIDIC Red Book — Variation Claim (Highway Project)

Context

Highway construction with 15 variation instructions issued by Engineer, causing cumulative delay and cost overrun

Solution

Event Log Compiler tracked all variations, Claim Narrative Drafter prepared comprehensive claim under Sub-Clause 13.7, Letter Drafter generated all correspondence

Outcome

INR 12 Crore variation claim submitted with full contemporaneous evidence, Engineer approval within 42 days

FIDIC Yellow Book — Delay Damages Defense (Power Plant)

Context

Employer alleged 60-day delay, contractor counterclaimed 45-day EOT with delay damages

Solution

Full Claims Intelligence Suite deployed — Notice Monitor verified all notices, Event Log compiled delay analysis, Claim Narrative drafted defense, Letters maintained contractual record

Outcome

Delay damages claim reduced from INR 50 Crore to INR 8 Crore, contractor recovered INR 15 Crore in delay damages

FIDIC Silver Book — Concurrent Delay (Airport Terminal)

Context

Airport terminal construction with concurrent delays from soil conditions (4.12) and Employer-caused design changes

Solution

Notice Monitor triggered Unforeseeable Conditions notice, Event Log attributed delay to both parties, Claim Narrative prepared concurrent delay analysis

Outcome

60-day EOT granted with no delay damages, contractor preserved entitlement under concurrent delay provisions

Frequently Asked Questions

What is the FIDIC Claims Intelligence Suite?

An integrated suite of four AI-assisted modules that automate FIDIC contractual claims preparation and correspondence. It covers notice monitoring, event logging, claim narrative drafting, and letter generation — designed by practitioners who have administered FIDIC contracts on EPC megaprojects.

Which FIDIC editions are supported?

The suite supports FIDIC 1999 (Red, Yellow, Silver Books) and FIDIC 2017 (2nd Edition). Clause references are mapped to both editions, with the 1999 editions as primary. Custom clause mapping is available for bespoke contracts.

Can I use individual modules without the full suite?

Yes. Each module operates independently. You can deploy FIDIC Notice Monitor as a standalone compliance tool, or use Letter Drafter EPC for all FIDIC correspondence. The suite delivers maximum value when all four modules work together.

How does this compare to generic contract management software?

Generic tools manage documents. The Claims Intelligence Suite manages obligations. It understands FIDIC clause deadlines, notice requirements, and claim entitlements — not just document storage. It was built by practitioners who have administered the exact contracts it serves.

What is the deployment model?

Cloud-hosted SaaS for immediate deployment, or on-premise installation for organizations with data sovereignty requirements. The Notice Monitor module is currently in building phase; other modules are in concept phase with defined specifications.

Is there a demo available?

Yes. Schedule a live demonstration using the calendar booking below. We will walk you through the FIDIC Notice Monitor demo scenario (MAHSR T-3) and show the concept specifications for the other three modules.

Download Centre

Product documentation for evaluation and internal review.

FIDIC Claims Intelligence Suite Overview

Executive overview of the complete FIDIC Claims Intelligence Suite — four modules, unified workflow.

PDFv1.0172 KBUpdated Jun 2026

FIDIC Notice Monitor One-Pager

FIDIC Notice Monitor product summary — features, workflow, pricing, deployment.

PDFv1.0146 KBUpdated Jun 2026

EOT Event Log Compiler — Concept Specification

Technical specification for the EOT Event Log Compiler — architecture, data model, workflow.

PDFv1.0169 KBUpdated Jun 2026

Claim Narrative Drafter — Concept Specification

Technical specification for the Claim Narrative Drafter — FIDIC 20.1 compliance, narrative structure.

PDFv1.0172 KBUpdated Jun 2026

Letter Drafter EPC — Concept Specification

Technical specification for Letter Drafter EPC — templates, clause mapping, correspondence workflow.

PDFv1.0170 KBUpdated Jun 2026

Request a Demonstration

See the FIDIC Claims Intelligence Suite in action. Schedule a walkthrough with the MAHSR T-3 demo scenario.

Schedule a Demonstration

30-minute live walkthrough of the FIDIC Claims Intelligence Suite with the MAHSR T-3 demo scenario.

Never Miss an Entitlement Again

Join the EPC contractors using AI-assisted claims preparation to preserve every contractual entitlement.